One of my earlier posts reported on a space that we had
submitted an LOI for. Well the love
affair must come to an end because we didn’t get it. I’m not going to lie, this stung. More like a bee sting vs. a jellyfish sting
but there is a twinge of pain nonetheless.
The space had SO much going for it but at the end of the day, there are
so many things that need to be in alignment.
The blessing and curse to this process is that we may never know why we
didn’t get it, I can only speculate. Ultimately, it doesn’t really matter.
We had been awaiting a “phase one” report that is basically an environmental
site assessment. Back in the 40’s or 50’s
the property used to be a gas station and the EPA findings had the potential to
be a hot mess. As they say, “On to the
next!”
Our primary area of interest in Phinney Ridge/Greenwood
which rumor has it the two are merging to become Phinney Wood. We would like an 1800-2200 square foot
building with outdoor seating potential.
Keep your eyes peeled.